10. THE PUSH BEFORE THE WINTER

So it turns out, when you’re busy, it’s hard to keep up with blog posts.

And, until I can convince my wife, Lauren, to quit her job and become our head of marketing, we’ll just have to settle for my lame and sporadic construction update posts.

There’s been some amazing progress recently with construction and the building is really starting to take shape.  We’re in the midst of a serious push to wrap up some outside work so everyone can move indoors before the winter weather catches us.  Rough grading of the site around the brewery is done and Southside Electric is here today hooking up power to the building.  Next steps include septic tank install, well hookup, exterior painting, and everything that awaits us on the inside of the building.  

Thanks for keeping up with us and while I’m not going to make another promise I can’t keep to be better about posting, we do ask that you check back soon for updates! 

-Mark

 Rough grading is almost done.  All we need is some grass seed and a whole lot of Adirondack chairs!

Rough grading is almost done.  All we need is some grass seed and a whole lot of Adirondack chairs!

 Front entrance is ready for its concrete walkway.

Front entrance is ready for its concrete walkway.

 All those stones we gathered on site are finally being put to use!

All those stones we gathered on site are finally being put to use!

 Masons are putting the finishing touches on the outdoor fireplace.

Masons are putting the finishing touches on the outdoor fireplace.

 Insulation has been completed on brewing space and taproom.

Insulation has been completed on brewing space and taproom.

 Beams have been wrapped inside the taproom and fireplace is almost complete.

Beams have been wrapped inside the taproom and fireplace is almost complete.

 Roof is officially done and paint colors are being tested!

Roof is officially done and paint colors are being tested!